No automation between the Day 4 safety-net SMS and the Day 6 close.
Silent · By DesignDay 5 is the second intentional silent window in the 6-day cadence. WF02 has no scheduled automation on Day 5 — the Day 4 safety-net SMS (Phase 4) fired yesterday, the Day 6 sequence close (Phase 5) fires tomorrow. Everything between is reception's discretion.
The cadence was designed with two silent gaps — Day 3 and Day 5 — so that every automated touch sits on its own. Back-to-back automation compounds into noise. One touch per day max, with two days of quiet room for the patient to move on their own, keeps the sequence inside the threshold of ethical follow-up.
No outbound SMS. No scheduled email. No automated tag changes. The cadence is waiting. The only movement is whatever reception initiates off their own dashboard — and whatever the patient replies unprompted.